Portfolio Performance
How much of the portfolio is genuinely being used, measured against what was bought.
0 of every 100 scored applications are at or above 70% utilization.
0 of 0 applications can be scored. 0 cannot — no usage source, or nothing to measure use against — and are left out of this figure rather than counted as unused. 0 applications have no contract record, carrying $0 of spend.
How The Portfolio Distributes
Strongest Usage Signals
No application has enough data to score a Usage Signal.
Watchlist
No application has enough data to score a Usage Signal.
Intake And Retirement
0 applications were added since this organization onboarded, and 0 were retired.
How This Is Counted
The Performance Score is the share of scorable applications at or above 70% applicable utilization. Applications with no usage source are excluded from the denominator, and their count is stated above — averaging them in as zero would report a data gap as a usage problem, and the two need different work. The 70% line is the one set in Settings → Configuration, not an Odau opinion.